YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Reasons for Cost and Schedule Increase for Engineering Design Projects

    Source: Journal of Management in Engineering:;2002:;Volume ( 018 ):;issue: 001
    Author:
    Andrew Shing-Tao Chang
    DOI: 10.1061/(ASCE)0742-597X(2002)18:1(29)
    Publisher: American Society of Civil Engineers
    Abstract: Cost and schedule increases are common in engineering design projects. Some research has studied factors associated with better design performance, but the reasons for cost and schedule increases are not formally investigated. This paper identifies the reasons bottom up from four case project documents and further quantifies their contributions to cost and schedule increases. These reasons are complete and can be used to analyze the cause-effect relationship, trace responsibility, and improve performance for engineering design projects.
    • Download: (76.00Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Reasons for Cost and Schedule Increase for Engineering Design Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/42334
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorAndrew Shing-Tao Chang
    date accessioned2017-05-08T21:11:44Z
    date available2017-05-08T21:11:44Z
    date copyrightJanuary 2002
    date issued2002
    identifier other%28asce%290742-597x%282002%2918%3A1%2829%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42334
    description abstractCost and schedule increases are common in engineering design projects. Some research has studied factors associated with better design performance, but the reasons for cost and schedule increases are not formally investigated. This paper identifies the reasons bottom up from four case project documents and further quantifies their contributions to cost and schedule increases. These reasons are complete and can be used to analyze the cause-effect relationship, trace responsibility, and improve performance for engineering design projects.
    publisherAmerican Society of Civil Engineers
    titleReasons for Cost and Schedule Increase for Engineering Design Projects
    typeJournal Paper
    journal volume18
    journal issue1
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(2002)18:1(29)
    treeJournal of Management in Engineering:;2002:;Volume ( 018 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian