YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Defining Cost/Schedule Performance Indices and Their Ranges for Design Projects

    Source: Journal of Management in Engineering:;2001:;Volume ( 017 ):;issue: 002
    Author:
    Andrew Shing-Tao Chang
    DOI: 10.1061/(ASCE)0742-597X(2001)17:2(122)
    Publisher: American Society of Civil Engineers
    Abstract: Cost/schedule performance indices (C/SPIs) can indicate project performance, but they need to be operationally defined to be more adopted in practice. This paper defines C/SPIs and their values for design projects. From observing design operations, the C/SPIs were defined at project and milestone levels, and their characteristics were identified. The value ranges, representing different degrees of performance, were determined from related research and tested by real data. The results show that the values and scores derived from the defined ranges effectively differentiate performance, which means the C/SPIs and ranges are well defined. The two-level C/SPIs and value ranges can enhance the application of the earned value concept and evaluate design project performance more systematically and accurately.
    • Download: (159.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Defining Cost/Schedule Performance Indices and Their Ranges for Design Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/42308
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorAndrew Shing-Tao Chang
    date accessioned2017-05-08T21:11:42Z
    date available2017-05-08T21:11:42Z
    date copyrightApril 2001
    date issued2001
    identifier other%28asce%290742-597x%282001%2917%3A2%28122%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42308
    description abstractCost/schedule performance indices (C/SPIs) can indicate project performance, but they need to be operationally defined to be more adopted in practice. This paper defines C/SPIs and their values for design projects. From observing design operations, the C/SPIs were defined at project and milestone levels, and their characteristics were identified. The value ranges, representing different degrees of performance, were determined from related research and tested by real data. The results show that the values and scores derived from the defined ranges effectively differentiate performance, which means the C/SPIs and ranges are well defined. The two-level C/SPIs and value ranges can enhance the application of the earned value concept and evaluate design project performance more systematically and accurately.
    publisherAmerican Society of Civil Engineers
    titleDefining Cost/Schedule Performance Indices and Their Ranges for Design Projects
    typeJournal Paper
    journal volume17
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(2001)17:2(122)
    treeJournal of Management in Engineering:;2001:;Volume ( 017 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian