YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Empirical Assessment of the Likelihood and Duration of Highway Project Time Delays 

    Source: Journal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 003
    Author(s): Panagiotis Ch. Anastasopoulos; Samuel Labi; Abhishek Bhargava; Fred L. Mannering
    Publisher: American Society of Civil Engineers
    Abstract: Delays in the completion of highway construction and maintenance projects are important concerns to state highway agencies and contractors alike because such time delays can have a number of adverse consequences, such as ...
    Request PDF

    Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts 

    Source: Journal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 011
    Author(s): Abhishek Bhargava; Panagiotis Ch. Anastasopoulos; Samuel Labi; Kumares C. Sinha; Fred L. Mannering
    Publisher: American Society of Civil Engineers
    Abstract: Construction cost overrun and time overrun (delay) are a significant problem in highway-construction project delivery. Previous research studies have provided insight into the factors that affect overruns; however the ...
    Request PDF

    Frequency of Change Orders in Highway Construction Using Alternate Count-Data Modeling Methods 

    Source: Journal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 008
    Author(s): Panagiotis Ch. Anastasopoulos; Samuel Labi; Abhishek Bhargava; Claire Bordat; Fred L. Mannering
    Publisher: American Society of Civil Engineers
    Abstract: A common problem at state transportation agencies is the inability to complete projects within the original scope of work. Change orders, which are contractual documents issued to accommodate the additional work in a ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian