YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts

    Source: Journal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 011
    Author:
    Abhishek Bhargava
    ,
    Panagiotis Ch. Anastasopoulos
    ,
    Samuel Labi
    ,
    Kumares C. Sinha
    ,
    Fred L. Mannering
    DOI: 10.1061/(ASCE)CO.1943-7862.0000225
    Publisher: American Society of Civil Engineers
    Abstract: Construction cost overrun and time overrun (delay) are a significant problem in highway-construction project delivery. Previous research studies have provided insight into the factors that affect overruns; however the findings may have been limited because they do not explicitly consider the simultaneous relationship between cost and time overruns. In this paper, we use data from Indiana highway projects to provide empirical evidence that a simultaneous relationship exists between cost and time overruns and that analysis of these two contractual outputs need to take due cognizance of such simultaneity. Using the three-stage least-squares technique, we identify a number of factors that significantly affect cost overrun and time overrun and we show how the effect of these variables vary by attributes such as project type and results of the bidding process. The models developed in this paper can help agencies enhance the estimation of the expected overruns of final cost and the delay in completion time for their planned projects.
    • Download: (577.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58377
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAbhishek Bhargava
    contributor authorPanagiotis Ch. Anastasopoulos
    contributor authorSamuel Labi
    contributor authorKumares C. Sinha
    contributor authorFred L. Mannering
    date accessioned2017-05-08T21:39:11Z
    date available2017-05-08T21:39:11Z
    date copyrightNovember 2010
    date issued2010
    identifier other%28asce%29co%2E1943-7862%2E0000231.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58377
    description abstractConstruction cost overrun and time overrun (delay) are a significant problem in highway-construction project delivery. Previous research studies have provided insight into the factors that affect overruns; however the findings may have been limited because they do not explicitly consider the simultaneous relationship between cost and time overruns. In this paper, we use data from Indiana highway projects to provide empirical evidence that a simultaneous relationship exists between cost and time overruns and that analysis of these two contractual outputs need to take due cognizance of such simultaneity. Using the three-stage least-squares technique, we identify a number of factors that significantly affect cost overrun and time overrun and we show how the effect of these variables vary by attributes such as project type and results of the bidding process. The models developed in this paper can help agencies enhance the estimation of the expected overruns of final cost and the delay in completion time for their planned projects.
    publisherAmerican Society of Civil Engineers
    titleThree-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts
    typeJournal Paper
    journal volume136
    journal issue11
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000225
    treeJournal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian