Wellbore Gyp-Scale ControlSource: Journal of Manufacturing Science and Engineering:;1975:;volume( 097 ):;issue: 002::page 507Author:T. L. Knowles
DOI: 10.1115/1.3438612Publisher: The American Society of Mechanical Engineers (ASME)
Abstract: Gyp-scale deposition in producing wellbores is a recognized problem in many West Texas oil fields. The results of gyp-scale formation are usually reduced producing rates, premature well abandonment, and high operating expenses. An effective gyp removal and inhibition program is necessary for successful operation where gyp-scaling problems exist. Development of the gyp-control program presently in effect in the Means (San Andres) Unit began in 1969 when gyp was originally detected in the Grayburg-San Andres reservoir of the Means Field in Andrews County, Texas. Prior to that time, a great deal of progress had been made in the area of gyp-scale control in the Means (Queen) reservoir which overlies the Grayburg-San Andres. This paper presents a description of the Means (San Andres) Unit Gyp Scale Control Program and the results achieved with that program.
keyword(s): Reservoirs AND Oil fields ,
|
Collections
Show full item record
| contributor author | T. L. Knowles | |
| date accessioned | 2017-05-08T22:59:22Z | |
| date available | 2017-05-08T22:59:22Z | |
| date copyright | May, 1975 | |
| date issued | 1975 | |
| identifier issn | 1087-1357 | |
| identifier other | JMSEFK-27623#507_1.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/87872 | |
| description abstract | Gyp-scale deposition in producing wellbores is a recognized problem in many West Texas oil fields. The results of gyp-scale formation are usually reduced producing rates, premature well abandonment, and high operating expenses. An effective gyp removal and inhibition program is necessary for successful operation where gyp-scaling problems exist. Development of the gyp-control program presently in effect in the Means (San Andres) Unit began in 1969 when gyp was originally detected in the Grayburg-San Andres reservoir of the Means Field in Andrews County, Texas. Prior to that time, a great deal of progress had been made in the area of gyp-scale control in the Means (Queen) reservoir which overlies the Grayburg-San Andres. This paper presents a description of the Means (San Andres) Unit Gyp Scale Control Program and the results achieved with that program. | |
| publisher | The American Society of Mechanical Engineers (ASME) | |
| title | Wellbore Gyp-Scale Control | |
| type | Journal Paper | |
| journal volume | 97 | |
| journal issue | 2 | |
| journal title | Journal of Manufacturing Science and Engineering | |
| identifier doi | 10.1115/1.3438612 | |
| journal fristpage | 507 | |
| journal lastpage | 512 | |
| identifier eissn | 1528-8935 | |
| keywords | Reservoirs AND Oil fields | |
| tree | Journal of Manufacturing Science and Engineering:;1975:;volume( 097 ):;issue: 002 | |
| contenttype | Fulltext |