Show simple item record

contributor authorT. L. Knowles
date accessioned2017-05-08T22:59:22Z
date available2017-05-08T22:59:22Z
date copyrightMay, 1975
date issued1975
identifier issn1087-1357
identifier otherJMSEFK-27623#507_1.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/87872
description abstractGyp-scale deposition in producing wellbores is a recognized problem in many West Texas oil fields. The results of gyp-scale formation are usually reduced producing rates, premature well abandonment, and high operating expenses. An effective gyp removal and inhibition program is necessary for successful operation where gyp-scaling problems exist. Development of the gyp-control program presently in effect in the Means (San Andres) Unit began in 1969 when gyp was originally detected in the Grayburg-San Andres reservoir of the Means Field in Andrews County, Texas. Prior to that time, a great deal of progress had been made in the area of gyp-scale control in the Means (Queen) reservoir which overlies the Grayburg-San Andres. This paper presents a description of the Means (San Andres) Unit Gyp Scale Control Program and the results achieved with that program.
publisherThe American Society of Mechanical Engineers (ASME)
titleWellbore Gyp-Scale Control
typeJournal Paper
journal volume97
journal issue2
journal titleJournal of Manufacturing Science and Engineering
identifier doi10.1115/1.3438612
journal fristpage507
journal lastpage512
identifier eissn1528-8935
keywordsReservoirs AND Oil fields
treeJournal of Manufacturing Science and Engineering:;1975:;volume( 097 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record