YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Probabilistic Monitoring of Project Performance Using SS-Curves

    Source: Journal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 002
    Author:
    Gabriel A. Barraza
    ,
    W. Edward Back
    ,
    Fernando Mata
    DOI: 10.1061/(ASCE)0733-9364(2000)126:2(142)
    Publisher: American Society of Civil Engineers
    Abstract: The purpose of this study was to develop a new concept of project control. This new concept uses stochastic S-curves (SS-Curves) as an alternative to using the deterministic S-curve technique commonly employed in professional practice. SS-curves are developed by determining the activity level variability in cost and duration. Simulation is the recommended approach for obtaining SS-curves, similar to the way that stochastic schedules are currently developed. SS-curves provide probability distributions for expected cost and duration for a given percentage of work completed. Monitoring project performance is performed by comparing the most likely budget and duration values, obtained from respective probability distributions for actual progress, with the project's actual data and cumulative cost. By using this method, an evaluation of actual project performance can be developed that appropriately considers the natural variability of construction costs and duration, rather than utilizing only one possible deterministic outcome. Given the probabilistic characteristics of SS-curves, additional benefits are presented that enable a more comprehensive project control methodology.
    • Download: (115.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Probabilistic Monitoring of Project Performance Using SS-Curves

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/86267
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorGabriel A. Barraza
    contributor authorW. Edward Back
    contributor authorFernando Mata
    date accessioned2017-05-08T22:40:56Z
    date available2017-05-08T22:40:56Z
    date copyrightMarch 2000
    date issued2000
    identifier other%28asce%290733-9364%282000%29126%3A2%28142%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/86267
    description abstractThe purpose of this study was to develop a new concept of project control. This new concept uses stochastic S-curves (SS-Curves) as an alternative to using the deterministic S-curve technique commonly employed in professional practice. SS-curves are developed by determining the activity level variability in cost and duration. Simulation is the recommended approach for obtaining SS-curves, similar to the way that stochastic schedules are currently developed. SS-curves provide probability distributions for expected cost and duration for a given percentage of work completed. Monitoring project performance is performed by comparing the most likely budget and duration values, obtained from respective probability distributions for actual progress, with the project's actual data and cumulative cost. By using this method, an evaluation of actual project performance can be developed that appropriately considers the natural variability of construction costs and duration, rather than utilizing only one possible deterministic outcome. Given the probabilistic characteristics of SS-curves, additional benefits are presented that enable a more comprehensive project control methodology.
    publisherAmerican Society of Civil Engineers
    titleProbabilistic Monitoring of Project Performance Using SS-Curves
    typeJournal Paper
    journal volume126
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2000)126:2(142)
    treeJournal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian