Show simple item record

contributor authorGabriel A. Barraza
contributor authorW. Edward Back
contributor authorFernando Mata
date accessioned2017-05-08T22:40:56Z
date available2017-05-08T22:40:56Z
date copyrightMarch 2000
date issued2000
identifier other%28asce%290733-9364%282000%29126%3A2%28142%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/86267
description abstractThe purpose of this study was to develop a new concept of project control. This new concept uses stochastic S-curves (SS-Curves) as an alternative to using the deterministic S-curve technique commonly employed in professional practice. SS-curves are developed by determining the activity level variability in cost and duration. Simulation is the recommended approach for obtaining SS-curves, similar to the way that stochastic schedules are currently developed. SS-curves provide probability distributions for expected cost and duration for a given percentage of work completed. Monitoring project performance is performed by comparing the most likely budget and duration values, obtained from respective probability distributions for actual progress, with the project's actual data and cumulative cost. By using this method, an evaluation of actual project performance can be developed that appropriately considers the natural variability of construction costs and duration, rather than utilizing only one possible deterministic outcome. Given the probabilistic characteristics of SS-curves, additional benefits are presented that enable a more comprehensive project control methodology.
publisherAmerican Society of Civil Engineers
titleProbabilistic Monitoring of Project Performance Using SS-Curves
typeJournal Paper
journal volume126
journal issue2
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2000)126:2(142)
treeJournal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record