YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Construction Management: MARTA in Retrospect

    Source: Journal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 004
    Author:
    James L. Lammie
    ,
    D. P. Shah
    DOI: 10.1061/(ASCE)0733-9364(1984)110:4(459)
    Publisher: American Society of Civil Engineers
    Abstract: The Metropolitan Atlanta Rapid Transit Authority (MARTA) System is a heavy rail, rapid transit system superimposed on the existing fabric of the Atlanta urban area. The MARTA program presented a unique opportunity to assess changes in the construction management process during a major project characterized by repetitive type contracts and a stable management group. A contract packaging approach was used to break the contract work into biddable packages, large enough to attract major national construction contractors, but small enough to provide real competition. A claims review board was established to process contractors' claims expeditiously. A list of practical management suggestions, compiled as a result of the experience gained from the MARTA construction management program, is included.
    • Download: (1.119Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Construction Management: MARTA in Retrospect

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/85834
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJames L. Lammie
    contributor authorD. P. Shah
    date accessioned2017-05-08T22:40:17Z
    date available2017-05-08T22:40:17Z
    date copyrightDecember 1984
    date issued1984
    identifier other%28asce%290733-9364%281984%29110%3A4%28459%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85834
    description abstractThe Metropolitan Atlanta Rapid Transit Authority (MARTA) System is a heavy rail, rapid transit system superimposed on the existing fabric of the Atlanta urban area. The MARTA program presented a unique opportunity to assess changes in the construction management process during a major project characterized by repetitive type contracts and a stable management group. A contract packaging approach was used to break the contract work into biddable packages, large enough to attract major national construction contractors, but small enough to provide real competition. A claims review board was established to process contractors' claims expeditiously. A list of practical management suggestions, compiled as a result of the experience gained from the MARTA construction management program, is included.
    publisherAmerican Society of Civil Engineers
    titleConstruction Management: MARTA in Retrospect
    typeJournal Paper
    journal volume110
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1984)110:4(459)
    treeJournal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian