Show simple item record

contributor authorJames L. Lammie
contributor authorD. P. Shah
date accessioned2017-05-08T22:40:17Z
date available2017-05-08T22:40:17Z
date copyrightDecember 1984
date issued1984
identifier other%28asce%290733-9364%281984%29110%3A4%28459%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85834
description abstractThe Metropolitan Atlanta Rapid Transit Authority (MARTA) System is a heavy rail, rapid transit system superimposed on the existing fabric of the Atlanta urban area. The MARTA program presented a unique opportunity to assess changes in the construction management process during a major project characterized by repetitive type contracts and a stable management group. A contract packaging approach was used to break the contract work into biddable packages, large enough to attract major national construction contractors, but small enough to provide real competition. A claims review board was established to process contractors' claims expeditiously. A list of practical management suggestions, compiled as a result of the experience gained from the MARTA construction management program, is included.
publisherAmerican Society of Civil Engineers
titleConstruction Management: MARTA in Retrospect
typeJournal Paper
journal volume110
journal issue4
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1984)110:4(459)
treeJournal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record