YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risk Evaluation in Resource Allocation

    Source: Journal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 003
    Author:
    Hira N. Ahuja
    ,
    Valliappa Aranachalam
    DOI: 10.1061/(ASCE)0733-9364(1984)110:3(324)
    Publisher: American Society of Civil Engineers
    Abstract: Conventional resource allocation procedures implicitly assume that the availability of resources is certain. In real life situations, their availability is, at times, uncertain. A Risk Evaluation Model (REM) is proposed to systematically evaluate the uncertainty of resource availability and generate several alternatives having varying project completion time, cost, and performance probability. REM can aid a contractor in “bid/no‐bid” decision‐making, an entrepreneur in investment decision‐making, and a consultancy organization in corporate planning.
    • Download: (693.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Risk Evaluation in Resource Allocation

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/84611
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorHira N. Ahuja
    contributor authorValliappa Aranachalam
    date accessioned2017-05-08T22:38:19Z
    date available2017-05-08T22:38:19Z
    date copyrightSeptember 1984
    date issued1984
    identifier other%28asce%290733-9364%281984%29110%3A3%28324%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/84611
    description abstractConventional resource allocation procedures implicitly assume that the availability of resources is certain. In real life situations, their availability is, at times, uncertain. A Risk Evaluation Model (REM) is proposed to systematically evaluate the uncertainty of resource availability and generate several alternatives having varying project completion time, cost, and performance probability. REM can aid a contractor in “bid/no‐bid” decision‐making, an entrepreneur in investment decision‐making, and a consultancy organization in corporate planning.
    publisherAmerican Society of Civil Engineers
    titleRisk Evaluation in Resource Allocation
    typeJournal Paper
    journal volume110
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1984)110:3(324)
    treeJournal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian