description abstractConventional resource allocation procedures implicitly assume that the availability of resources is certain. In real life situations, their availability is, at times, uncertain. A Risk Evaluation Model (REM) is proposed to systematically evaluate the uncertainty of resource availability and generate several alternatives having varying project completion time, cost, and performance probability. REM can aid a contractor in “bid/no‐bid” decision‐making, an entrepreneur in investment decision‐making, and a consultancy organization in corporate planning.
publisherAmerican Society of Civil Engineers
titleRisk Evaluation in Resource Allocation
typeJournal Paper
journal volume110
journal issue3
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1984)110:3(324)
treeJournal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record