YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Incentive/Disincentive Provisions in Highway Contracts

    Source: Journal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 003
    Author:
    David Arditi
    ,
    C. Jotin Khisty
    ,
    Firuzan Yasamis
    DOI: 10.1061/(ASCE)0733-9364(1997)123:3(302)
    Publisher: American Society of Civil Engineers
    Abstract: The objective of the study reported in this paper is to compare contracts that include incentive/disincentive (I/D) provisions against contracts that do not include I/D provisions, with regard to the consequences of these measures. The study involves both completed and ongoing highway and bridge renovation/rehabilitation projects undertaken by the Illinois Department of Transportation (IDOT). After a general overview of I/D implementation, the results of a study that covered 28 I/D contracts (contracts that included I/D provisions) and 29 non-I/D contracts undertaken by IDOT during the five-year period 1989–93 are presented. The major finding of this study is that the majority of the I/D contracts are completed on time or sooner, which supports the use of I/D provisions in these contracts. However, this saving in contract duration seems to be accompanied by increased project costs most of the time.
    • Download: (1.052Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Incentive/Disincentive Provisions in Highway Contracts

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/84512
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorDavid Arditi
    contributor authorC. Jotin Khisty
    contributor authorFiruzan Yasamis
    date accessioned2017-05-08T22:38:09Z
    date available2017-05-08T22:38:09Z
    date copyrightSeptember 1997
    date issued1997
    identifier other%28asce%290733-9364%281997%29123%3A3%28302%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/84512
    description abstractThe objective of the study reported in this paper is to compare contracts that include incentive/disincentive (I/D) provisions against contracts that do not include I/D provisions, with regard to the consequences of these measures. The study involves both completed and ongoing highway and bridge renovation/rehabilitation projects undertaken by the Illinois Department of Transportation (IDOT). After a general overview of I/D implementation, the results of a study that covered 28 I/D contracts (contracts that included I/D provisions) and 29 non-I/D contracts undertaken by IDOT during the five-year period 1989–93 are presented. The major finding of this study is that the majority of the I/D contracts are completed on time or sooner, which supports the use of I/D provisions in these contracts. However, this saving in contract duration seems to be accompanied by increased project costs most of the time.
    publisherAmerican Society of Civil Engineers
    titleIncentive/Disincentive Provisions in Highway Contracts
    typeJournal Paper
    journal volume123
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1997)123:3(302)
    treeJournal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian