| contributor author | David Arditi | |
| contributor author | C. Jotin Khisty | |
| contributor author | Firuzan Yasamis | |
| date accessioned | 2017-05-08T22:38:09Z | |
| date available | 2017-05-08T22:38:09Z | |
| date copyright | September 1997 | |
| date issued | 1997 | |
| identifier other | %28asce%290733-9364%281997%29123%3A3%28302%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/84512 | |
| description abstract | The objective of the study reported in this paper is to compare contracts that include incentive/disincentive (I/D) provisions against contracts that do not include I/D provisions, with regard to the consequences of these measures. The study involves both completed and ongoing highway and bridge renovation/rehabilitation projects undertaken by the Illinois Department of Transportation (IDOT). After a general overview of I/D implementation, the results of a study that covered 28 I/D contracts (contracts that included I/D provisions) and 29 non-I/D contracts undertaken by IDOT during the five-year period 1989–93 are presented. The major finding of this study is that the majority of the I/D contracts are completed on time or sooner, which supports the use of I/D provisions in these contracts. However, this saving in contract duration seems to be accompanied by increased project costs most of the time. | |
| publisher | American Society of Civil Engineers | |
| title | Incentive/Disincentive Provisions in Highway Contracts | |
| type | Journal Paper | |
| journal volume | 123 | |
| journal issue | 3 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)0733-9364(1997)123:3(302) | |
| tree | Journal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 003 | |
| contenttype | Fulltext | |