YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Cumulative Effects on the Change of Residual Value in PPP Projects: A Comparative Case Study

    Source: Journal of Infrastructure Systems:;2016:;Volume ( 022 ):;issue: 002
    Author:
    Jingfeng Yuan
    ,
    Albert P. C. Chan
    ,
    Bo Xia
    ,
    Mirosław J. Skibniewski
    ,
    Wei Xiong
    ,
    Chuang Ji
    DOI: 10.1061/(ASCE)IS.1943-555X.0000272
    Publisher: American Society of Civil Engineers
    Abstract: Public private partnerships (PPPs) have been adopted widely to provide public facilities and services. According to the PPP agreement, PPP projects would be transferred to the public sector. However, problems related to the subsequent management of ongoing PPP projects have not been studied thoroughly. Residual value risk (RVR) can occur if the public sector cannot obtain the project in the desired conditions as required in the agreement when a project is being transferred. RVR has been identified as an important risk in PPPs and has greatly influenced the outputs of the projects. In order to further observe the change of residual value (RV) during the process of PPP projects and to reveal the internal mechanism for reducing the RVR, a comparative case study of two PPP projects in mainland China and Hong Kong was conducted. Based on the case study, different factors leading to RVR and a series of key risk indicators (KRIs) were identified. The comparison demonstrates that RVR is an important risk that could influence the success of PPP projects. The cumulative effects during the concession period can play significant roles in the occurrence of RVR. Additionally, the cumulative effects in different cases can make the RVR different because of different stakeholders’ efforts on the projects and ways to treat RVR. Finally, alternatives for the public sector to treat RVR were proposed. The findings of this research can reduce RVR and improve the performance of PPP projects.
    • Download: (8.166Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Cumulative Effects on the Change of Residual Value in PPP Projects: A Comparative Case Study

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/81402
    Collections
    • Journal of Infrastructure Systems

    Show full item record

    contributor authorJingfeng Yuan
    contributor authorAlbert P. C. Chan
    contributor authorBo Xia
    contributor authorMirosław J. Skibniewski
    contributor authorWei Xiong
    contributor authorChuang Ji
    date accessioned2017-05-08T22:29:12Z
    date available2017-05-08T22:29:12Z
    date copyrightJune 2016
    date issued2016
    identifier other46521999.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/81402
    description abstractPublic private partnerships (PPPs) have been adopted widely to provide public facilities and services. According to the PPP agreement, PPP projects would be transferred to the public sector. However, problems related to the subsequent management of ongoing PPP projects have not been studied thoroughly. Residual value risk (RVR) can occur if the public sector cannot obtain the project in the desired conditions as required in the agreement when a project is being transferred. RVR has been identified as an important risk in PPPs and has greatly influenced the outputs of the projects. In order to further observe the change of residual value (RV) during the process of PPP projects and to reveal the internal mechanism for reducing the RVR, a comparative case study of two PPP projects in mainland China and Hong Kong was conducted. Based on the case study, different factors leading to RVR and a series of key risk indicators (KRIs) were identified. The comparison demonstrates that RVR is an important risk that could influence the success of PPP projects. The cumulative effects during the concession period can play significant roles in the occurrence of RVR. Additionally, the cumulative effects in different cases can make the RVR different because of different stakeholders’ efforts on the projects and ways to treat RVR. Finally, alternatives for the public sector to treat RVR were proposed. The findings of this research can reduce RVR and improve the performance of PPP projects.
    publisherAmerican Society of Civil Engineers
    titleCumulative Effects on the Change of Residual Value in PPP Projects: A Comparative Case Study
    typeJournal Paper
    journal volume22
    journal issue2
    journal titleJournal of Infrastructure Systems
    identifier doi10.1061/(ASCE)IS.1943-555X.0000272
    treeJournal of Infrastructure Systems:;2016:;Volume ( 022 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian