YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Audit Contract Provisions and Real-Time Cost Reporting in Construction Contracting

    Source: Journal of Professional Issues in Engineering Education and Practice:;2005:;Volume ( 131 ):;issue: 004
    Author:
    Donald D. Wyse
    ,
    Saahil Malik
    DOI: 10.1061/(ASCE)1052-3928(2005)131:4(297)
    Publisher: American Society of Civil Engineers
    Abstract: With the advent of contracting methods in the construction industry that result in the owner compensating a contractor for “actual costs” as opposed to a lump-sum payment, the owner must protect its interest by taking on the responsibility of confirming amounts actually incurred by the contractor and determining if these amounts are allowable under the terms of the contract. To succeed at such an endeavor, an owner must have a general understanding of contract interpretation, the risk of not incorporating an express audit provision in its contract, and the implications of not implementing a real-time reporting structure. This paper sets forth the benefits of requiring a real-time reporting structure in the owner-contractor agreement.
    • Download: (62.74Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Audit Contract Provisions and Real-Time Cost Reporting in Construction Contracting

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/72143
    Collections
    • Journal of Professional Issues in Engineering Education and Practice

    Show full item record

    contributor authorDonald D. Wyse
    contributor authorSaahil Malik
    date accessioned2017-05-08T22:08:26Z
    date available2017-05-08T22:08:26Z
    date copyrightOctober 2005
    date issued2005
    identifier other32326862.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/72143
    description abstractWith the advent of contracting methods in the construction industry that result in the owner compensating a contractor for “actual costs” as opposed to a lump-sum payment, the owner must protect its interest by taking on the responsibility of confirming amounts actually incurred by the contractor and determining if these amounts are allowable under the terms of the contract. To succeed at such an endeavor, an owner must have a general understanding of contract interpretation, the risk of not incorporating an express audit provision in its contract, and the implications of not implementing a real-time reporting structure. This paper sets forth the benefits of requiring a real-time reporting structure in the owner-contractor agreement.
    publisherAmerican Society of Civil Engineers
    titleAudit Contract Provisions and Real-Time Cost Reporting in Construction Contracting
    typeJournal Paper
    journal volume131
    journal issue4
    journal titleJournal of Professional Issues in Engineering Education and Practice
    identifier doi10.1061/(ASCE)1052-3928(2005)131:4(297)
    treeJournal of Professional Issues in Engineering Education and Practice:;2005:;Volume ( 131 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian