Show simple item record

contributor authorDonald D. Wyse
contributor authorSaahil Malik
date accessioned2017-05-08T22:08:26Z
date available2017-05-08T22:08:26Z
date copyrightOctober 2005
date issued2005
identifier other32326862.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/72143
description abstractWith the advent of contracting methods in the construction industry that result in the owner compensating a contractor for “actual costs” as opposed to a lump-sum payment, the owner must protect its interest by taking on the responsibility of confirming amounts actually incurred by the contractor and determining if these amounts are allowable under the terms of the contract. To succeed at such an endeavor, an owner must have a general understanding of contract interpretation, the risk of not incorporating an express audit provision in its contract, and the implications of not implementing a real-time reporting structure. This paper sets forth the benefits of requiring a real-time reporting structure in the owner-contractor agreement.
publisherAmerican Society of Civil Engineers
titleAudit Contract Provisions and Real-Time Cost Reporting in Construction Contracting
typeJournal Paper
journal volume131
journal issue4
journal titleJournal of Professional Issues in Engineering Education and Practice
identifier doi10.1061/(ASCE)1052-3928(2005)131:4(297)
treeJournal of Professional Issues in Engineering Education and Practice:;2005:;Volume ( 131 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record