YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Possibilistic Moments for the Task Duration in Fuzzy PERT

    Source: Journal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 005
    Author:
    Konstantinos A. Chrysafis
    ,
    Basil K. Papadopoulos
    DOI: 10.1061/(ASCE)ME.1943-5479.0000296
    Publisher: American Society of Civil Engineers
    Abstract: Program (or project) evaluation review technique (PERT) has remained a modern method in project scheduling for decades. Since its invention, numerous authors have tried modifications to its basic method in an attempt to overcome its intrinsic drawbacks. In this paper, the authors research improvements to the Fuzzy version of PERT. The initial motivation is the avoidance of the backward recursion problem in Fuzzy PERT, with fuzzy input data for the task durations through an alternative approach. Furthermore, the authors propose various membership functions for the representation of the fuzzy task duration in accordance with the nature of each task. This approach is intended to give more realistic results. The tools for this operation are the possibilistic mean and the possibilistic variance of fuzzy numbers. The possibilistic method acts as a defuzzification method that results in a crisp value as an outcome both for the task times (earliest/latest start - earliest/latest finish) and for the floats (total/free/safety). The authors also base this study on estimates of experts in project scheduling who are experienced in time management. A practical application is also provided for a better comprehension of the proposed method.
    • Download: (1.442Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Possibilistic Moments for the Task Duration in Fuzzy PERT

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/71677
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorKonstantinos A. Chrysafis
    contributor authorBasil K. Papadopoulos
    date accessioned2017-05-08T22:07:01Z
    date available2017-05-08T22:07:01Z
    date copyrightSeptember 2015
    date issued2015
    identifier other29366337.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/71677
    description abstractProgram (or project) evaluation review technique (PERT) has remained a modern method in project scheduling for decades. Since its invention, numerous authors have tried modifications to its basic method in an attempt to overcome its intrinsic drawbacks. In this paper, the authors research improvements to the Fuzzy version of PERT. The initial motivation is the avoidance of the backward recursion problem in Fuzzy PERT, with fuzzy input data for the task durations through an alternative approach. Furthermore, the authors propose various membership functions for the representation of the fuzzy task duration in accordance with the nature of each task. This approach is intended to give more realistic results. The tools for this operation are the possibilistic mean and the possibilistic variance of fuzzy numbers. The possibilistic method acts as a defuzzification method that results in a crisp value as an outcome both for the task times (earliest/latest start - earliest/latest finish) and for the floats (total/free/safety). The authors also base this study on estimates of experts in project scheduling who are experienced in time management. A practical application is also provided for a better comprehension of the proposed method.
    publisherAmerican Society of Civil Engineers
    titlePossibilistic Moments for the Task Duration in Fuzzy PERT
    typeJournal Paper
    journal volume31
    journal issue5
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000296
    treeJournal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian