Show simple item record

contributor authorKonstantinos A. Chrysafis
contributor authorBasil K. Papadopoulos
date accessioned2017-05-08T22:07:01Z
date available2017-05-08T22:07:01Z
date copyrightSeptember 2015
date issued2015
identifier other29366337.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/71677
description abstractProgram (or project) evaluation review technique (PERT) has remained a modern method in project scheduling for decades. Since its invention, numerous authors have tried modifications to its basic method in an attempt to overcome its intrinsic drawbacks. In this paper, the authors research improvements to the Fuzzy version of PERT. The initial motivation is the avoidance of the backward recursion problem in Fuzzy PERT, with fuzzy input data for the task durations through an alternative approach. Furthermore, the authors propose various membership functions for the representation of the fuzzy task duration in accordance with the nature of each task. This approach is intended to give more realistic results. The tools for this operation are the possibilistic mean and the possibilistic variance of fuzzy numbers. The possibilistic method acts as a defuzzification method that results in a crisp value as an outcome both for the task times (earliest/latest start - earliest/latest finish) and for the floats (total/free/safety). The authors also base this study on estimates of experts in project scheduling who are experienced in time management. A practical application is also provided for a better comprehension of the proposed method.
publisherAmerican Society of Civil Engineers
titlePossibilistic Moments for the Task Duration in Fuzzy PERT
typeJournal Paper
journal volume31
journal issue5
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0000296
treeJournal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record