YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Where Do We Stand with Fuzzy Project Scheduling?

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 001
    Author:
    Pierre Bonnal
    ,
    Didier Gourc
    ,
    Germain Lacoste
    DOI: 10.1061/(ASCE)0733-9364(2004)130:1(114)
    Publisher: American Society of Civil Engineers
    Abstract: Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that are most suited to these situations have been kept in the academic sphere. This paper starts by recalling the differences one can observe between uncertainty and imprecision. Then most of the published research works that have been done in this field are summarized. Finally, a framework for addressing the resource-constrained fuzzy project-scheduling problem is proposed. This framework uses temporal linguistic descriptors, which might become very interesting features to the project-scheduling practitioners.
    • Download: (338.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Where Do We Stand with Fuzzy Project Scheduling?

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/70947
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorPierre Bonnal
    contributor authorDidier Gourc
    contributor authorGermain Lacoste
    date accessioned2017-05-08T22:05:17Z
    date available2017-05-08T22:05:17Z
    date copyrightFebruary 2004
    date issued2004
    identifier other20785029.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/70947
    description abstractFuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that are most suited to these situations have been kept in the academic sphere. This paper starts by recalling the differences one can observe between uncertainty and imprecision. Then most of the published research works that have been done in this field are summarized. Finally, a framework for addressing the resource-constrained fuzzy project-scheduling problem is proposed. This framework uses temporal linguistic descriptors, which might become very interesting features to the project-scheduling practitioners.
    publisherAmerican Society of Civil Engineers
    titleWhere Do We Stand with Fuzzy Project Scheduling?
    typeJournal Paper
    journal volume130
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2004)130:1(114)
    treeJournal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian