contributor authorPierre Bonnal
contributor authorDidier Gourc
contributor authorGermain Lacoste
date accessioned2017-05-08T22:05:17Z
date available2017-05-08T22:05:17Z
date copyrightFebruary 2004
date issued2004
identifier other20785029.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/70947
description abstractFuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that are most suited to these situations have been kept in the academic sphere. This paper starts by recalling the differences one can observe between uncertainty and imprecision. Then most of the published research works that have been done in this field are summarized. Finally, a framework for addressing the resource-constrained fuzzy project-scheduling problem is proposed. This framework uses temporal linguistic descriptors, which might become very interesting features to the project-scheduling practitioners.
publisherAmerican Society of Civil Engineers
titleWhere Do We Stand with Fuzzy Project Scheduling?
typeJournal Paper
journal volume130
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2004)130:1(114)
treeJournal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 001