YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Locked or Liberated: East Somerville, a Transit-Oriented Development Opportunity

    Source: Leadership and Management in Engineering:;2010:;Volume ( 010 ):;issue: 002
    Author:
    Steven A. Heikin
    ,
    Beatrice Nessen
    DOI: 10.1061/(ASCE)LM.1943-5630.0000056
    Publisher: American Society of Civil Engineers
    Abstract: Transportation infrastructure has cut off the Inner Belt District of Somerville, Mass., from the rest of the city and has precluded its full development potential. The implementation of the proposed Green Line Extension to Medford and Phase II of the Urban Ring, as well as the development of North Point, are potential catalysts for change. This article describes a vision for reconnecting the Inner Belt District to the rest of Somerville and the nearby technology centers of Cambridge through additional transportation infrastructure changes that would eliminate one of the major barriers to accessing the area.
    • Download: (179.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Locked or Liberated: East Somerville, a Transit-Oriented Development Opportunity

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/65916
    Collections
    • Leadership and Management in Engineering

    Show full item record

    contributor authorSteven A. Heikin
    contributor authorBeatrice Nessen
    date accessioned2017-05-08T21:54:11Z
    date available2017-05-08T21:54:11Z
    date copyrightApril 2010
    date issued2010
    identifier other%28asce%29lm%2E1943-5630%2E0000098.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/65916
    description abstractTransportation infrastructure has cut off the Inner Belt District of Somerville, Mass., from the rest of the city and has precluded its full development potential. The implementation of the proposed Green Line Extension to Medford and Phase II of the Urban Ring, as well as the development of North Point, are potential catalysts for change. This article describes a vision for reconnecting the Inner Belt District to the rest of Somerville and the nearby technology centers of Cambridge through additional transportation infrastructure changes that would eliminate one of the major barriers to accessing the area.
    publisherAmerican Society of Civil Engineers
    titleLocked or Liberated: East Somerville, a Transit-Oriented Development Opportunity
    typeJournal Paper
    journal volume10
    journal issue2
    journal titleLeadership and Management in Engineering
    identifier doi10.1061/(ASCE)LM.1943-5630.0000056
    treeLeadership and Management in Engineering:;2010:;Volume ( 010 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian