YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Complicated Working Time Arrangements: Construction Industry Case Study

    Source: Journal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 003
    Author:
    Keith Townsend
    ,
    Helen Lingard
    ,
    Lisa Bradley
    ,
    Kerry Brown
    DOI: 10.1061/(ASCE)CO.1943-7862.0000436
    Publisher: American Society of Civil Engineers
    Abstract: This paper extends the understanding of working-time changes and work-life balance (WLB) through analyzing a case study where a reduction in working hours designed to assist the workforce in balancing work and nonwork life was implemented. An alliance project in the Australian construction industry was established initially with a 5-day working week, a departure from the industry-standard 6-day week. However, a range of factors complicated the success of this initiative, and the industry-standard 6-day working week was reinstated for the project. The authors argue that this case is valuable in determining the complex mix of influences that work against a wholesale or straightforward adoption of working-time adjustments and work-life balance practices. It is concluded that although the prevailing workplace culture is considered an important factor in the determination of working time, structural and workplace principles and practices may also be critical in working to secure the successful introduction of working-time reduction and work-life balance initiatives in the construction industry in the future.
    • Download: (837.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Complicated Working Time Arrangements: Construction Industry Case Study

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/58598
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorKeith Townsend
    contributor authorHelen Lingard
    contributor authorLisa Bradley
    contributor authorKerry Brown
    date accessioned2017-05-08T21:39:34Z
    date available2017-05-08T21:39:34Z
    date copyrightMarch 2012
    date issued2012
    identifier other%28asce%29co%2E1943-7862%2E0000442.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58598
    description abstractThis paper extends the understanding of working-time changes and work-life balance (WLB) through analyzing a case study where a reduction in working hours designed to assist the workforce in balancing work and nonwork life was implemented. An alliance project in the Australian construction industry was established initially with a 5-day working week, a departure from the industry-standard 6-day week. However, a range of factors complicated the success of this initiative, and the industry-standard 6-day working week was reinstated for the project. The authors argue that this case is valuable in determining the complex mix of influences that work against a wholesale or straightforward adoption of working-time adjustments and work-life balance practices. It is concluded that although the prevailing workplace culture is considered an important factor in the determination of working time, structural and workplace principles and practices may also be critical in working to secure the successful introduction of working-time reduction and work-life balance initiatives in the construction industry in the future.
    publisherAmerican Society of Civil Engineers
    titleComplicated Working Time Arrangements: Construction Industry Case Study
    typeJournal Paper
    journal volume138
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000436
    treeJournal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian