YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Short-Interval Dynamic Forecasting for Actual <b><i>S</i></b>-Curve in the Construction Phase

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 011
    Author:
    Ying-Mei Cheng
    ,
    Chih-Han Yu
    ,
    Huai-Tien Wang
    DOI: 10.1061/(ASCE)CO.1943-7862.0000358
    Publisher: American Society of Civil Engineers
    Abstract: Traditional approaches for cost forecasting tend to utilize a single model for the entire construction period. However, a construction project, consisting of different stages, will incur different costs, which may not be accurately captured by a single model. Gates separated the
    • Download: (1.493Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Short-Interval Dynamic Forecasting for Actual <b><i>S</i></b>-Curve in the Construction Phase

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/58517
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorYing-Mei Cheng
    contributor authorChih-Han Yu
    contributor authorHuai-Tien Wang
    date accessioned2017-05-08T21:39:26Z
    date available2017-05-08T21:39:26Z
    date copyrightNovember 2011
    date issued2011
    identifier other%28asce%29co%2E1943-7862%2E0000364.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58517
    description abstractTraditional approaches for cost forecasting tend to utilize a single model for the entire construction period. However, a construction project, consisting of different stages, will incur different costs, which may not be accurately captured by a single model. Gates separated the
    publisherAmerican Society of Civil Engineers
    titleShort-Interval Dynamic Forecasting for Actual S-Curve in the Construction Phase
    typeJournal Paper
    journal volume137
    journal issue11
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000358
    treeJournal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian