description abstractTraditional approaches for cost forecasting tend to utilize a single model for the entire construction period. However, a construction project, consisting of different stages, will incur different costs, which may not be accurately captured by a single model. Gates separated the
publisherAmerican Society of Civil Engineers
titleShort-Interval Dynamic Forecasting for Actual S-Curve in the Construction Phase
typeJournal Paper
journal volume137
journal issue11
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0000358
treeJournal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 011
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record