YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Intermittent Project Management

    Source: Journal of Management in Engineering:;1989:;Volume ( 005 ):;issue: 001
    Author:
    Craig C. Roberts
    DOI: 10.1061/(ASCE)9742-597X(1989)5:1(84)
    Publisher: American Society of Civil Engineers
    Abstract: An inevitable aspect of project management is that project managers come and go. The schedule, cost, and quality of a project are impacted by the changes resulting from project manager turnover. The writer has learned a number of lessons through personal experience in completing projects initiated by another project manager. Some of these lessons concerning milestones, contacts, introductions, commitments, decisions, critical path, data base, and paperwork are presented in this paper. The adverse effect on projects caused by project manager turbulence can be minimized through the use of these methods.
    • Download: (281.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Intermittent Project Management

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/55717
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorCraig C. Roberts
    date accessioned2017-05-08T21:32:55Z
    date available2017-05-08T21:32:55Z
    date copyrightJanuary 1989
    date issued1989
    identifier other%28asce%299742-597x%281989%295%3A1%2884%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55717
    description abstractAn inevitable aspect of project management is that project managers come and go. The schedule, cost, and quality of a project are impacted by the changes resulting from project manager turnover. The writer has learned a number of lessons through personal experience in completing projects initiated by another project manager. Some of these lessons concerning milestones, contacts, introductions, commitments, decisions, critical path, data base, and paperwork are presented in this paper. The adverse effect on projects caused by project manager turbulence can be minimized through the use of these methods.
    publisherAmerican Society of Civil Engineers
    titleIntermittent Project Management
    typeJournal Paper
    journal volume5
    journal issue1
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)9742-597X(1989)5:1(84)
    treeJournal of Management in Engineering:;1989:;Volume ( 005 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian