YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Case Study as to the Effectiveness of Dispute Review Boards on the Central Artery/Tunnel Project

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2009:;Volume ( 001 ):;issue: 001
    Author:
    Kathleen M. Harmon
    DOI: 10.1061/(ASCE)1943-4162(2009)1:1(18)
    Publisher: American Society of Civil Engineers
    Abstract: The most prevalent use of the dispute review board (DRB) process in the United States to date is the central artery/tunnel project located in Boston. A DRB is a three-member panel jointly chosen by the contractor and owner that is present throughout the course of the contract, and whose responsibility it is to hear disputes contemporaneously with their occurrence. This paper reviews the efficacy of the DRB on the central artery/tunnel project answering such questions as to whether or not (1) there was any discernable bid savings between DRB and non-DRB contracts; (2) the DRB was successful in resolving all disputes prior to contract completion; (3) were there any barriers to the DRB’s effectiveness, concerning bid savings; and (4) the DRB reduced the costs of resolving disputes. The questions are timely and important in an industry that looks for new ways to reduce construction costs and values timely prevention and resolution to disputes.
    • Download: (233.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Case Study as to the Effectiveness of Dispute Review Boards on the Central Artery/Tunnel Project

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/55521
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorKathleen M. Harmon
    date accessioned2017-05-08T21:32:37Z
    date available2017-05-08T21:32:37Z
    date copyrightFebruary 2009
    date issued2009
    identifier other%28asce%291943-4162%282009%291%3A1%2818%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55521
    description abstractThe most prevalent use of the dispute review board (DRB) process in the United States to date is the central artery/tunnel project located in Boston. A DRB is a three-member panel jointly chosen by the contractor and owner that is present throughout the course of the contract, and whose responsibility it is to hear disputes contemporaneously with their occurrence. This paper reviews the efficacy of the DRB on the central artery/tunnel project answering such questions as to whether or not (1) there was any discernable bid savings between DRB and non-DRB contracts; (2) the DRB was successful in resolving all disputes prior to contract completion; (3) were there any barriers to the DRB’s effectiveness, concerning bid savings; and (4) the DRB reduced the costs of resolving disputes. The questions are timely and important in an industry that looks for new ways to reduce construction costs and values timely prevention and resolution to disputes.
    publisherAmerican Society of Civil Engineers
    titleCase Study as to the Effectiveness of Dispute Review Boards on the Central Artery/Tunnel Project
    typeJournal Paper
    journal volume1
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)1943-4162(2009)1:1(18)
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2009:;Volume ( 001 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian