description abstractThe most prevalent use of the dispute review board (DRB) process in the United States to date is the central artery/tunnel project located in Boston. A DRB is a three-member panel jointly chosen by the contractor and owner that is present throughout the course of the contract, and whose responsibility it is to hear disputes contemporaneously with their occurrence. This paper reviews the efficacy of the DRB on the central artery/tunnel project answering such questions as to whether or not (1) there was any discernable bid savings between DRB and non-DRB contracts; (2) the DRB was successful in resolving all disputes prior to contract completion; (3) were there any barriers to the DRB’s effectiveness, concerning bid savings; and (4) the DRB reduced the costs of resolving disputes. The questions are timely and important in an industry that looks for new ways to reduce construction costs and values timely prevention and resolution to disputes.
publisherAmerican Society of Civil Engineers
titleCase Study as to the Effectiveness of Dispute Review Boards on the Central Artery/Tunnel Project
typeJournal Paper
journal volume1
journal issue1
journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
identifier doi10.1061/(ASCE)1943-4162(2009)1:1(18)
treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2009:;Volume ( 001 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record