YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    The Process Is the Product: Collaborative Design in Four Silicon Valley Schools

    Source: Leadership and Management in Engineering:;2008:;Volume ( 008 ):;issue: 004
    Author:
    Karen Lee Hansen
    DOI: 10.1061/(ASCE)1532-6748(2008)8:4(200)
    Publisher: American Society of Civil Engineers
    Abstract: In 1995 the city of Palo Alto passed a $143 million bond initiative to upgrade sixteen elementary and secondary schools. At that time this was the largest school bond ever passed by a California municipality. I outline the process used to arrive at the final design (contract documents) phase of four elementary schools. I also address the trend toward greater collaboration between design professionals and stakeholders.
    • Download: (230.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      The Process Is the Product: Collaborative Design in Four Silicon Valley Schools

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/55472
    Collections
    • Leadership and Management in Engineering

    Show full item record

    contributor authorKaren Lee Hansen
    date accessioned2017-05-08T21:32:32Z
    date available2017-05-08T21:32:32Z
    date copyrightOctober 2008
    date issued2008
    identifier other%28asce%291532-6748%282008%298%3A4%28200%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55472
    description abstractIn 1995 the city of Palo Alto passed a $143 million bond initiative to upgrade sixteen elementary and secondary schools. At that time this was the largest school bond ever passed by a California municipality. I outline the process used to arrive at the final design (contract documents) phase of four elementary schools. I also address the trend toward greater collaboration between design professionals and stakeholders.
    publisherAmerican Society of Civil Engineers
    titleThe Process Is the Product: Collaborative Design in Four Silicon Valley Schools
    typeJournal Paper
    journal volume8
    journal issue4
    journal titleLeadership and Management in Engineering
    identifier doi10.1061/(ASCE)1532-6748(2008)8:4(200)
    treeLeadership and Management in Engineering:;2008:;Volume ( 008 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian