Show simple item record

contributor authorKaren Lee Hansen
date accessioned2017-05-08T21:32:32Z
date available2017-05-08T21:32:32Z
date copyrightOctober 2008
date issued2008
identifier other%28asce%291532-6748%282008%298%3A4%28200%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55472
description abstractIn 1995 the city of Palo Alto passed a $143 million bond initiative to upgrade sixteen elementary and secondary schools. At that time this was the largest school bond ever passed by a California municipality. I outline the process used to arrive at the final design (contract documents) phase of four elementary schools. I also address the trend toward greater collaboration between design professionals and stakeholders.
publisherAmerican Society of Civil Engineers
titleThe Process Is the Product: Collaborative Design in Four Silicon Valley Schools
typeJournal Paper
journal volume8
journal issue4
journal titleLeadership and Management in Engineering
identifier doi10.1061/(ASCE)1532-6748(2008)8:4(200)
treeLeadership and Management in Engineering:;2008:;Volume ( 008 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record