YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Environmental Impacts to Design/Build Projects— A Case Study of the St. George Island Bridge Replacement, Apalachicola Bay, Florida

    Source: Leadership and Management in Engineering:;2003:;Volume ( 003 ):;issue: 003
    Author:
    Jeffrey P. Toussant
    DOI: 10.1061/(ASCE)1532-6748(2003)3:3(128)
    Publisher: American Society of Civil Engineers
    Abstract: The additional environmental considerations that arise for contractors on design/build projects are discussed, with attention given to the perspectives of the owner and the contractor. The factors that made this particular project suitable for design/build are then described, as are the criteria used in the selection process. The steps taken by the Boh Bros./Sverdrup team to minimize the effect on the sensitive marine environment are recounted, and the way in which certain design elements aided in this effort is discussed. The importance of detailed consultations with all the parties affected by the project is stressed.
    • Download: (245.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Environmental Impacts to Design/Build Projects— A Case Study of the St. George Island Bridge Replacement, Apalachicola Bay, Florida

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/55339
    Collections
    • Leadership and Management in Engineering

    Show full item record

    contributor authorJeffrey P. Toussant
    date accessioned2017-05-08T21:32:20Z
    date available2017-05-08T21:32:20Z
    date copyrightJuly 2003
    date issued2003
    identifier other%28asce%291532-6748%282003%293%3A3%28128%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55339
    description abstractThe additional environmental considerations that arise for contractors on design/build projects are discussed, with attention given to the perspectives of the owner and the contractor. The factors that made this particular project suitable for design/build are then described, as are the criteria used in the selection process. The steps taken by the Boh Bros./Sverdrup team to minimize the effect on the sensitive marine environment are recounted, and the way in which certain design elements aided in this effort is discussed. The importance of detailed consultations with all the parties affected by the project is stressed.
    publisherAmerican Society of Civil Engineers
    titleEnvironmental Impacts to Design/Build Projects— A Case Study of the St. George Island Bridge Replacement, Apalachicola Bay, Florida
    typeJournal Paper
    journal volume3
    journal issue3
    journal titleLeadership and Management in Engineering
    identifier doi10.1061/(ASCE)1532-6748(2003)3:3(128)
    treeLeadership and Management in Engineering:;2003:;Volume ( 003 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian