YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Drill and Blast Tunneling Practices

    Source: Practice Periodical on Structural Design and Construction:;2002:;Volume ( 007 ):;issue: 003
    Author:
    Gerhard Girmscheid
    ,
    Cliff Schexnayder
    DOI: 10.1061/(ASCE)1084-0680(2002)7:3(125)
    Publisher: American Society of Civil Engineers
    Abstract: High-performance drill and blast methods for tunnel construction require that each of the individual working elements that constitute the construction process are optimized and considered as a system of sequential and parallel activities. The advantage of integrating the logistic backup systems facilitates an increase in performance. To achieve increased production, it is necessary to improve the drilling, explosive loading, temporary ground support installation—rock bolts, steel mesh, shotcrete, steel sets, lagging, mucking, and logistics. Better blast techniques, partial robotilization, and integration of all systems and processes is also necessary.
    • Download: (1.295Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Drill and Blast Tunneling Practices

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/49054
    Collections
    • Journal of Structural Design and Construction Practice

    Show full item record

    contributor authorGerhard Girmscheid
    contributor authorCliff Schexnayder
    date accessioned2017-05-08T21:22:40Z
    date available2017-05-08T21:22:40Z
    date copyrightAugust 2002
    date issued2002
    identifier other%28asce%291084-0680%282002%297%3A3%28125%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/49054
    description abstractHigh-performance drill and blast methods for tunnel construction require that each of the individual working elements that constitute the construction process are optimized and considered as a system of sequential and parallel activities. The advantage of integrating the logistic backup systems facilitates an increase in performance. To achieve increased production, it is necessary to improve the drilling, explosive loading, temporary ground support installation—rock bolts, steel mesh, shotcrete, steel sets, lagging, mucking, and logistics. Better blast techniques, partial robotilization, and integration of all systems and processes is also necessary.
    publisherAmerican Society of Civil Engineers
    titleDrill and Blast Tunneling Practices
    typeJournal Paper
    journal volume7
    journal issue3
    journal titlePractice Periodical on Structural Design and Construction
    identifier doi10.1061/(ASCE)1084-0680(2002)7:3(125)
    treePractice Periodical on Structural Design and Construction:;2002:;Volume ( 007 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian