| contributor author | Gerhard Girmscheid | |
| contributor author | Cliff Schexnayder | |
| date accessioned | 2017-05-08T21:22:40Z | |
| date available | 2017-05-08T21:22:40Z | |
| date copyright | August 2002 | |
| date issued | 2002 | |
| identifier other | %28asce%291084-0680%282002%297%3A3%28125%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/49054 | |
| description abstract | High-performance drill and blast methods for tunnel construction require that each of the individual working elements that constitute the construction process are optimized and considered as a system of sequential and parallel activities. The advantage of integrating the logistic backup systems facilitates an increase in performance. To achieve increased production, it is necessary to improve the drilling, explosive loading, temporary ground support installation—rock bolts, steel mesh, shotcrete, steel sets, lagging, mucking, and logistics. Better blast techniques, partial robotilization, and integration of all systems and processes is also necessary. | |
| publisher | American Society of Civil Engineers | |
| title | Drill and Blast Tunneling Practices | |
| type | Journal Paper | |
| journal volume | 7 | |
| journal issue | 3 | |
| journal title | Practice Periodical on Structural Design and Construction | |
| identifier doi | 10.1061/(ASCE)1084-0680(2002)7:3(125) | |
| tree | Practice Periodical on Structural Design and Construction:;2002:;Volume ( 007 ):;issue: 003 | |
| contenttype | Fulltext | |