description abstractHigh-performance drill and blast methods for tunnel construction require that each of the individual working elements that constitute the construction process are optimized and considered as a system of sequential and parallel activities. The advantage of integrating the logistic backup systems facilitates an increase in performance. To achieve increased production, it is necessary to improve the drilling, explosive loading, temporary ground support installation—rock bolts, steel mesh, shotcrete, steel sets, lagging, mucking, and logistics. Better blast techniques, partial robotilization, and integration of all systems and processes is also necessary.
publisherAmerican Society of Civil Engineers
titleDrill and Blast Tunneling Practices
typeJournal Paper
journal volume7
journal issue3
journal titlePractice Periodical on Structural Design and Construction
identifier doi10.1061/(ASCE)1084-0680(2002)7:3(125)
treePractice Periodical on Structural Design and Construction:;2002:;Volume ( 007 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record