YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Management of Prefabrication for Complex Cladding: Case Study

    Source: Journal of Architectural Engineering:;1997:;Volume ( 003 ):;issue: 002
    Author:
    Alistair G. F. Gibb
    ,
    Richard H. Neale
    DOI: 10.1061/(ASCE)1076-0431(1997)3:2(60)
    Publisher: American Society of Civil Engineers
    Abstract: It is not inconceivable that everything except the basic structure of an office building could be prefabricated in the near future. Quality and schedule are nearly always improved with prefabrication due to the simple change from an uncontrolled work environment to a controlled one. One Ludgate Place, is a 23,600 m
    • Download: (1.591Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Management of Prefabrication for Complex Cladding: Case Study

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/48511
    Collections
    • Journal of Architectural Engineering

    Show full item record

    contributor authorAlistair G. F. Gibb
    contributor authorRichard H. Neale
    date accessioned2017-05-08T21:21:49Z
    date available2017-05-08T21:21:49Z
    date copyrightJune 1997
    date issued1997
    identifier other%28asce%291076-0431%281997%293%3A2%2860%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/48511
    description abstractIt is not inconceivable that everything except the basic structure of an office building could be prefabricated in the near future. Quality and schedule are nearly always improved with prefabrication due to the simple change from an uncontrolled work environment to a controlled one. One Ludgate Place, is a 23,600 m
    publisherAmerican Society of Civil Engineers
    titleManagement of Prefabrication for Complex Cladding: Case Study
    typeJournal Paper
    journal volume3
    journal issue2
    journal titleJournal of Architectural Engineering
    identifier doi10.1061/(ASCE)1076-0431(1997)3:2(60)
    treeJournal of Architectural Engineering:;1997:;Volume ( 003 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian