| contributor author | Alistair G. F. Gibb | |
| contributor author | Richard H. Neale | |
| date accessioned | 2017-05-08T21:21:49Z | |
| date available | 2017-05-08T21:21:49Z | |
| date copyright | June 1997 | |
| date issued | 1997 | |
| identifier other | %28asce%291076-0431%281997%293%3A2%2860%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/48511 | |
| description abstract | It is not inconceivable that everything except the basic structure of an office building could be prefabricated in the near future. Quality and schedule are nearly always improved with prefabrication due to the simple change from an uncontrolled work environment to a controlled one. One Ludgate Place, is a 23,600 m | |
| publisher | American Society of Civil Engineers | |
| title | Management of Prefabrication for Complex Cladding: Case Study | |
| type | Journal Paper | |
| journal volume | 3 | |
| journal issue | 2 | |
| journal title | Journal of Architectural Engineering | |
| identifier doi | 10.1061/(ASCE)1076-0431(1997)3:2(60) | |
| tree | Journal of Architectural Engineering:;1997:;Volume ( 003 ):;issue: 002 | |
| contenttype | Fulltext | |