Show simple item record

contributor authorAlistair G. F. Gibb
contributor authorRichard H. Neale
date accessioned2017-05-08T21:21:49Z
date available2017-05-08T21:21:49Z
date copyrightJune 1997
date issued1997
identifier other%28asce%291076-0431%281997%293%3A2%2860%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/48511
description abstractIt is not inconceivable that everything except the basic structure of an office building could be prefabricated in the near future. Quality and schedule are nearly always improved with prefabrication due to the simple change from an uncontrolled work environment to a controlled one. One Ludgate Place, is a 23,600 m
publisherAmerican Society of Civil Engineers
titleManagement of Prefabrication for Complex Cladding: Case Study
typeJournal Paper
journal volume3
journal issue2
journal titleJournal of Architectural Engineering
identifier doi10.1061/(ASCE)1076-0431(1997)3:2(60)
treeJournal of Architectural Engineering:;1997:;Volume ( 003 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record