YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Mediation/Arbitration: Alternative Dispute Resolution Process

    Source: Journal of Performance of Constructed Facilities:;1987:;Volume ( 001 ):;issue: 003
    Author:
    John P. Gnaedinger
    DOI: 10.1061/(ASCE)0887-3828(1987)1:3(150)
    Publisher: American Society of Civil Engineers
    Abstract: Interest in alternative dispute resolution (ADR) techniques for the construction industry has grown in recent years. Traditional litigation has been criticized on several fronts. The traditional procedures are often cumbersome, expensive, and lengthy. The outcome of litigation is uncertain and often confusing. For certain cases, alternative procedures may be useful in quickly resolving disputes. Sometimes there is no alternative to litigation. Each case is unique, and the appropriate form of dispute resolution mechanism must be established for each project. This paper reviews the process of mediation/arbitration, and compares that process to other alternative dispute resolution procedures.
    • Download: (663.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Mediation/Arbitration: Alternative Dispute Resolution Process

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/43833
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorJohn P. Gnaedinger
    date accessioned2017-05-08T21:14:13Z
    date available2017-05-08T21:14:13Z
    date copyrightAugust 1987
    date issued1987
    identifier other%28asce%290887-3828%281987%291%3A3%28150%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/43833
    description abstractInterest in alternative dispute resolution (ADR) techniques for the construction industry has grown in recent years. Traditional litigation has been criticized on several fronts. The traditional procedures are often cumbersome, expensive, and lengthy. The outcome of litigation is uncertain and often confusing. For certain cases, alternative procedures may be useful in quickly resolving disputes. Sometimes there is no alternative to litigation. Each case is unique, and the appropriate form of dispute resolution mechanism must be established for each project. This paper reviews the process of mediation/arbitration, and compares that process to other alternative dispute resolution procedures.
    publisherAmerican Society of Civil Engineers
    titleMediation/Arbitration: Alternative Dispute Resolution Process
    typeJournal Paper
    journal volume1
    journal issue3
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)0887-3828(1987)1:3(150)
    treeJournal of Performance of Constructed Facilities:;1987:;Volume ( 001 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian