YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Scheduling Resource-Constrained Projects with Ant Colony Optimization Artificial Agents

    Source: Journal of Computing in Civil Engineering:;2010:;Volume ( 024 ):;issue: 001
    Author:
    Symeon Christodoulou
    DOI: 10.1061/(ASCE)0887-3801(2010)24:1(45)
    Publisher: American Society of Civil Engineers
    Abstract: The paper presents a methodology to schedule resource-constrained construction projects by use of algorithms based on ant colony optimization (ACO); an artificial agent inspired by the collective behavior of natural ant colonies as they optimize their path from an origin (ant nest) to a destination (food source) by use of previously acquired knowledge. Further, to an application of the ACO artificial agent to a resource-unconstrained network topology, the method is applied to a resource-constrained network and utilized in examining the effects of resource availability constraints to critical path calculations and project completion time.
    • Download: (567.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Scheduling Resource-Constrained Projects with Ant Colony Optimization Artificial Agents

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/43448
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorSymeon Christodoulou
    date accessioned2017-05-08T21:13:36Z
    date available2017-05-08T21:13:36Z
    date copyrightJanuary 2010
    date issued2010
    identifier other%28asce%290887-3801%282010%2924%3A1%2845%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/43448
    description abstractThe paper presents a methodology to schedule resource-constrained construction projects by use of algorithms based on ant colony optimization (ACO); an artificial agent inspired by the collective behavior of natural ant colonies as they optimize their path from an origin (ant nest) to a destination (food source) by use of previously acquired knowledge. Further, to an application of the ACO artificial agent to a resource-unconstrained network topology, the method is applied to a resource-constrained network and utilized in examining the effects of resource availability constraints to critical path calculations and project completion time.
    publisherAmerican Society of Civil Engineers
    titleScheduling Resource-Constrained Projects with Ant Colony Optimization Artificial Agents
    typeJournal Paper
    journal volume24
    journal issue1
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)0887-3801(2010)24:1(45)
    treeJournal of Computing in Civil Engineering:;2010:;Volume ( 024 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian