Show simple item record

contributor authorSymeon Christodoulou
date accessioned2017-05-08T21:13:36Z
date available2017-05-08T21:13:36Z
date copyrightJanuary 2010
date issued2010
identifier other%28asce%290887-3801%282010%2924%3A1%2845%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/43448
description abstractThe paper presents a methodology to schedule resource-constrained construction projects by use of algorithms based on ant colony optimization (ACO); an artificial agent inspired by the collective behavior of natural ant colonies as they optimize their path from an origin (ant nest) to a destination (food source) by use of previously acquired knowledge. Further, to an application of the ACO artificial agent to a resource-unconstrained network topology, the method is applied to a resource-constrained network and utilized in examining the effects of resource availability constraints to critical path calculations and project completion time.
publisherAmerican Society of Civil Engineers
titleScheduling Resource-Constrained Projects with Ant Colony Optimization Artificial Agents
typeJournal Paper
journal volume24
journal issue1
journal titleJournal of Computing in Civil Engineering
identifier doi10.1061/(ASCE)0887-3801(2010)24:1(45)
treeJournal of Computing in Civil Engineering:;2010:;Volume ( 024 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record