YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Key Factors and Transmission Mechanisms ofCost Risk in General Engineering ContractingProjects Based on Legal Cases

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 003::page 04526031-1
    Author:
    Wang, Xumin
    ,
    Kai, Kang
    DOI: 10.1061/JLADAH.LADR-1463
    Publisher: American Society of Civil Engineers
    Abstract: AbstractThe engineering–procurement–construction (EPC) model has been widely adopted in construction practice for its ability to achieve efficient integration and unified coordination across project phases. However, the diversity and complexity of cost ...Practical ApplicationsThis study provides a data-driven approach to identifying and managing cost risks in engineering-procurement-construction projects throughout their entire life cycle. Based on 212 legal cases from China, the research systematically ...
    • Download: (952.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Key Factors and Transmission Mechanisms ofCost Risk in General Engineering ContractingProjects Based on Legal Cases

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4311928
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorWang, Xumin
    contributor authorKai, Kang
    date accessioned2026-08-20T11:15:33Z
    date available2026-08-20T11:15:33Z
    date copyright2026/05/24
    date issued2026
    identifier otherJLADAH.LADR-1463.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311928
    description abstractAbstractThe engineering–procurement–construction (EPC) model has been widely adopted in construction practice for its ability to achieve efficient integration and unified coordination across project phases. However, the diversity and complexity of cost ...Practical ApplicationsThis study provides a data-driven approach to identifying and managing cost risks in engineering-procurement-construction projects throughout their entire life cycle. Based on 212 legal cases from China, the research systematically ...
    publisherAmerican Society of Civil Engineers
    titleKey Factors and Transmission Mechanisms ofCost Risk in General Engineering ContractingProjects Based on Legal Cases
    typeJournal Article
    journal volume18
    journal issue3
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/JLADAH.LADR-1463
    journal fristpage04526031-1
    journal lastpage04526031-14
    page14
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian