Show simple item record

contributor authorWang, Xumin
contributor authorKai, Kang
date accessioned2026-08-20T11:15:33Z
date available2026-08-20T11:15:33Z
date copyright2026/05/24
date issued2026
identifier otherJLADAH.LADR-1463.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311928
description abstractAbstractThe engineering–procurement–construction (EPC) model has been widely adopted in construction practice for its ability to achieve efficient integration and unified coordination across project phases. However, the diversity and complexity of cost ...Practical ApplicationsThis study provides a data-driven approach to identifying and managing cost risks in engineering-procurement-construction projects throughout their entire life cycle. Based on 212 legal cases from China, the research systematically ...
publisherAmerican Society of Civil Engineers
titleKey Factors and Transmission Mechanisms ofCost Risk in General Engineering ContractingProjects Based on Legal Cases
typeJournal Article
journal volume18
journal issue3
journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
identifier doi10.1061/JLADAH.LADR-1463
journal fristpage04526031-1
journal lastpage04526031-14
page14
treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record