| contributor author | Lee, Jung Hyun | |
| contributor author | Seok, Changmin | |
| contributor author | Hamilton, Parker | |
| contributor author | Kingsley, Gordon | |
| contributor author | Ashuri, Baabak | |
| date accessioned | 2026-08-20T11:14:34Z | |
| date available | 2026-08-20T11:14:34Z | |
| date copyright | 2025/09/23 | |
| date issued | 2026 | |
| identifier other | JLADAH.LADR-1381.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311902 | |
| description abstract | AbstractIn design–build (DB) projects, the design–builder is engaged before the design is
fully completed, embedding unknown factors, such as subsurface conditions and design
commitments, into the project. Given the limited time available for procurement, ... | |
| publisher | American Society of Civil Engineers | |
| title | Strategies for Effective Scope Validation during Pre- and Postaward Phases in Design–Build Infrastructure Projects | |
| type | Journal Article | |
| journal volume | 18 | |
| journal issue | 1 | |
| journal title | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction | |
| identifier doi | 10.1061/JLADAH.LADR-1381 | |
| journal fristpage | 04525074-1 | |
| journal lastpage | 04525074-12 | |
| page | 12 | |
| tree | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 001 | |
| contenttype | Fulltext | |