Show simple item record

contributor authorLee, Jung Hyun
contributor authorSeok, Changmin
contributor authorHamilton, Parker
contributor authorKingsley, Gordon
contributor authorAshuri, Baabak
date accessioned2026-08-20T11:14:34Z
date available2026-08-20T11:14:34Z
date copyright2025/09/23
date issued2026
identifier otherJLADAH.LADR-1381.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311902
description abstractAbstractIn design–build (DB) projects, the design–builder is engaged before the design is fully completed, embedding unknown factors, such as subsurface conditions and design commitments, into the project. Given the limited time available for procurement, ...
publisherAmerican Society of Civil Engineers
titleStrategies for Effective Scope Validation during Pre- and Postaward Phases in Design–Build Infrastructure Projects
typeJournal Article
journal volume18
journal issue1
journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
identifier doi10.1061/JLADAH.LADR-1381
journal fristpage04525074-1
journal lastpage04525074-12
page12
treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record