YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Blockchain-Based Time Impact Analysis Method for Sustainable Delay Management in EPC Projects

    Source: Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 006::page 04026074-1
    Author:
    Piyush, null
    ,
    Rajak, Ph.D., Sonu
    ,
    K. E. K., Ph.D., Vimal
    DOI: 10.1061/JCEMD4.COENG-17359
    Publisher: American Society of Civil Engineers
    Abstract: AbstractDelays in engineering, procurement, and construction (EPC) projects lead to disputes and cost overruns, exacerbated by the shortcomings of traditional time impact analysis (TIA) in transparency, security, and sustainability. This study introduces ...
    • Download: (4.576Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Blockchain-Based Time Impact Analysis Method for Sustainable Delay Management in EPC Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4311143
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorPiyush, null
    contributor authorRajak, Ph.D., Sonu
    contributor authorK. E. K., Ph.D., Vimal
    date accessioned2026-08-20T10:42:07Z
    date available2026-08-20T10:42:07Z
    date copyright2026/04/14
    date issued2026
    identifier otherJCEMD4.COENG-17359.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311143
    description abstractAbstractDelays in engineering, procurement, and construction (EPC) projects lead to disputes and cost overruns, exacerbated by the shortcomings of traditional time impact analysis (TIA) in transparency, security, and sustainability. This study introduces ...
    publisherAmerican Society of Civil Engineers
    titleBlockchain-Based Time Impact Analysis Method for Sustainable Delay Management in EPC Projects
    typeJournal Article
    journal volume152
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-17359
    journal fristpage04026074-1
    journal lastpage04026074-20
    page20
    treeJournal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian