Show simple item record

contributor authorPiyush, null
contributor authorRajak, Ph.D., Sonu
contributor authorK. E. K., Ph.D., Vimal
date accessioned2026-08-20T10:42:07Z
date available2026-08-20T10:42:07Z
date copyright2026/04/14
date issued2026
identifier otherJCEMD4.COENG-17359.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311143
description abstractAbstractDelays in engineering, procurement, and construction (EPC) projects lead to disputes and cost overruns, exacerbated by the shortcomings of traditional time impact analysis (TIA) in transparency, security, and sustainability. This study introduces ...
publisherAmerican Society of Civil Engineers
titleBlockchain-Based Time Impact Analysis Method for Sustainable Delay Management in EPC Projects
typeJournal Article
journal volume152
journal issue6
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/JCEMD4.COENG-17359
journal fristpage04026074-1
journal lastpage04026074-20
page20
treeJournal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record