YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Project Scheduling to Minimize the Time and Cost in Large-Scale Construction Projects with Repulsion-Based Improved Arithmetic Optimization

    Source: Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 003::page 04025277-1
    Author:
    Toğan, Vedat
    ,
    Said Sulub, Abdikarim
    ,
    Azim Eirgash, Mohammad
    ,
    Mostofi, Fatemeh
    DOI: 10.1061/JCEMD4.COENG-17269
    Publisher: American Society of Civil Engineers
    Abstract: AbstractOptimally balancing project duration and cost significantly enhances overall project value. Nevertheless, managing this dual-objective optimization becomes increasingly challenging as the number of activities and their associated execution modes ...
    • Download: (1.560Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Project Scheduling to Minimize the Time and Cost in Large-Scale Construction Projects with Repulsion-Based Improved Arithmetic Optimization

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4311135
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorToğan, Vedat
    contributor authorSaid Sulub, Abdikarim
    contributor authorAzim Eirgash, Mohammad
    contributor authorMostofi, Fatemeh
    date accessioned2026-08-20T10:41:47Z
    date available2026-08-20T10:41:47Z
    date copyright2025/12/29
    date issued2026
    identifier otherJCEMD4.COENG-17269.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311135
    description abstractAbstractOptimally balancing project duration and cost significantly enhances overall project value. Nevertheless, managing this dual-objective optimization becomes increasingly challenging as the number of activities and their associated execution modes ...
    publisherAmerican Society of Civil Engineers
    titleProject Scheduling to Minimize the Time and Cost in Large-Scale Construction Projects with Repulsion-Based Improved Arithmetic Optimization
    typeJournal Article
    journal volume152
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-17269
    journal fristpage04025277-1
    journal lastpage04025277-19
    page19
    treeJournal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian