contributor authorToğan, Vedat
contributor authorSaid Sulub, Abdikarim
contributor authorAzim Eirgash, Mohammad
contributor authorMostofi, Fatemeh
date accessioned2026-08-20T10:41:47Z
date available2026-08-20T10:41:47Z
date copyright2025/12/29
date issued2026
identifier otherJCEMD4.COENG-17269.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311135
description abstractAbstractOptimally balancing project duration and cost significantly enhances overall project value. Nevertheless, managing this dual-objective optimization becomes increasingly challenging as the number of activities and their associated execution modes ...
publisherAmerican Society of Civil Engineers
titleProject Scheduling to Minimize the Time and Cost in Large-Scale Construction Projects with Repulsion-Based Improved Arithmetic Optimization
typeJournal Article
journal volume152
journal issue3
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/JCEMD4.COENG-17269
journal fristpage04025277-1
journal lastpage04025277-19
page19
treeJournal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 003
contenttypeFulltext