| description abstract | AbstractOptimally balancing project duration and cost significantly enhances overall project
value. Nevertheless, managing this dual-objective optimization becomes increasingly
challenging as the number of activities and their associated execution modes ... | |
| publisher | American Society of Civil Engineers | |
| title | Project Scheduling to Minimize the Time and Cost in Large-Scale Construction Projects with Repulsion-Based Improved Arithmetic Optimization | |
| type | Journal Article | |
| journal volume | 152 | |
| journal issue | 3 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/JCEMD4.COENG-17269 | |
| journal fristpage | 04025277-1 | |
| journal lastpage | 04025277-19 | |
| page | 19 | |
| tree | Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 003 | |
| contenttype | Fulltext | |