YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Multiobjective Construction Schedule Optimization with Labor Resource Allocation: Coupling Parameter-Adaptive Genetic Algorithm and Network Flow

    Source: Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 005::page 04026053-1
    Author:
    Li, Yue
    ,
    Gao, Rui
    ,
    Wu, Haitao
    ,
    Wen, Jiangtao
    ,
    Li, Tianxiang
    ,
    Dong, Xiaoqin
    DOI: 10.1061/JCEMD4.COENG-17127
    Publisher: American Society of Civil Engineers
    Abstract: AbstractAlthough labor resource allocation is critical in the labor-intensive construction industry, it is typically performed only after the schedule has been determined. This “schedule leads, labor follows” paradigm not only sidelines labor’s role in ...Practical ApplicationsThis study presents an AN3-NF model for the integrated optimization of construction scheduling and labor resource allocation, offering significant practical value. Adaptive parameter tuning and building information modeling (BIM) ...
    • Download: (11.92Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Multiobjective Construction Schedule Optimization with Labor Resource Allocation: Coupling Parameter-Adaptive Genetic Algorithm and Network Flow

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4311116
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorLi, Yue
    contributor authorGao, Rui
    contributor authorWu, Haitao
    contributor authorWen, Jiangtao
    contributor authorLi, Tianxiang
    contributor authorDong, Xiaoqin
    date accessioned2026-08-20T10:40:54Z
    date available2026-08-20T10:40:54Z
    date copyright2026/03/16
    date issued2026
    identifier otherJCEMD4.COENG-17127.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311116
    description abstractAbstractAlthough labor resource allocation is critical in the labor-intensive construction industry, it is typically performed only after the schedule has been determined. This “schedule leads, labor follows” paradigm not only sidelines labor’s role in ...Practical ApplicationsThis study presents an AN3-NF model for the integrated optimization of construction scheduling and labor resource allocation, offering significant practical value. Adaptive parameter tuning and building information modeling (BIM) ...
    publisherAmerican Society of Civil Engineers
    titleMultiobjective Construction Schedule Optimization with Labor Resource Allocation: Coupling Parameter-Adaptive Genetic Algorithm and Network Flow
    typeJournal Article
    journal volume152
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-17127
    journal fristpage04026053-1
    journal lastpage04026053-26
    page26
    treeJournal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian