Show simple item record

contributor authorLi, Yue
contributor authorGao, Rui
contributor authorWu, Haitao
contributor authorWen, Jiangtao
contributor authorLi, Tianxiang
contributor authorDong, Xiaoqin
date accessioned2026-08-20T10:40:54Z
date available2026-08-20T10:40:54Z
date copyright2026/03/16
date issued2026
identifier otherJCEMD4.COENG-17127.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311116
description abstractAbstractAlthough labor resource allocation is critical in the labor-intensive construction industry, it is typically performed only after the schedule has been determined. This “schedule leads, labor follows” paradigm not only sidelines labor’s role in ...Practical ApplicationsThis study presents an AN3-NF model for the integrated optimization of construction scheduling and labor resource allocation, offering significant practical value. Adaptive parameter tuning and building information modeling (BIM) ...
publisherAmerican Society of Civil Engineers
titleMultiobjective Construction Schedule Optimization with Labor Resource Allocation: Coupling Parameter-Adaptive Genetic Algorithm and Network Flow
typeJournal Article
journal volume152
journal issue5
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/JCEMD4.COENG-17127
journal fristpage04026053-1
journal lastpage04026053-26
page26
treeJournal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record