| contributor author | Li, Yue | |
| contributor author | Gao, Rui | |
| contributor author | Wu, Haitao | |
| contributor author | Wen, Jiangtao | |
| contributor author | Li, Tianxiang | |
| contributor author | Dong, Xiaoqin | |
| date accessioned | 2026-08-20T10:40:54Z | |
| date available | 2026-08-20T10:40:54Z | |
| date copyright | 2026/03/16 | |
| date issued | 2026 | |
| identifier other | JCEMD4.COENG-17127.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311116 | |
| description abstract | AbstractAlthough labor resource allocation is critical in the labor-intensive construction
industry, it is typically performed only after the schedule has been determined. This
“schedule leads, labor follows” paradigm not only sidelines labor’s role in ...Practical ApplicationsThis study presents an AN3-NF model for the integrated optimization of construction
scheduling and labor resource allocation, offering significant practical value. Adaptive
parameter tuning and building information modeling (BIM) ... | |
| publisher | American Society of Civil Engineers | |
| title | Multiobjective Construction Schedule Optimization with Labor Resource Allocation: Coupling Parameter-Adaptive Genetic Algorithm and Network Flow | |
| type | Journal Article | |
| journal volume | 152 | |
| journal issue | 5 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/JCEMD4.COENG-17127 | |
| journal fristpage | 04026053-1 | |
| journal lastpage | 04026053-26 | |
| page | 26 | |
| tree | Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 005 | |
| contenttype | Fulltext | |