YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Assessment of Pay Item Specific Case–Based Reasoning Approach for Bridge Unit Cost Estimation

    Source: Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 012::page 04025188-1
    Author:
    Eamon, Christopher
    ,
    Shinki, Kazuhiko
    ,
    Wong, Kin Hang
    ,
    Alsendi, Ahmad
    DOI: 10.1061/JCEMD4.COENG-17052
    Publisher: American Society of Civil Engineers
    Abstract: AbstractA pay item specific case–based reasoning (PCBR) approach was developed and assessed for estimation of bridge repair and replacement unit costs. Rather than predict overall project or unit cost as with typical case-based reasoning (CBR) methods, ...Practical ApplicationsThe case-based reasoning (CBR) method has been shown to be an effective way to improve the accuracy of cost estimates. CBR is based on the idea of using the costs of previous, similar projects to estimate the cost of a future ...
    • Download: (472.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Assessment of Pay Item Specific Case–Based Reasoning Approach for Bridge Unit Cost Estimation

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4311109
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorEamon, Christopher
    contributor authorShinki, Kazuhiko
    contributor authorWong, Kin Hang
    contributor authorAlsendi, Ahmad
    date accessioned2026-08-20T10:40:39Z
    date available2026-08-20T10:40:39Z
    date copyright2025/09/16
    date issued2025
    identifier otherJCEMD4.COENG-17052.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311109
    description abstractAbstractA pay item specific case–based reasoning (PCBR) approach was developed and assessed for estimation of bridge repair and replacement unit costs. Rather than predict overall project or unit cost as with typical case-based reasoning (CBR) methods, ...Practical ApplicationsThe case-based reasoning (CBR) method has been shown to be an effective way to improve the accuracy of cost estimates. CBR is based on the idea of using the costs of previous, similar projects to estimate the cost of a future ...
    publisherAmerican Society of Civil Engineers
    titleAssessment of Pay Item Specific Case–Based Reasoning Approach for Bridge Unit Cost Estimation
    typeJournal Article
    journal volume151
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-17052
    journal fristpage04025188-1
    journal lastpage04025188-12
    page12
    treeJournal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian