description abstractAbstractA pay item specific case–based reasoning (PCBR) approach was developed and assessed for estimation of bridge repair and replacement unit costs. Rather than predict overall project or unit cost as with typical case-based reasoning (CBR) methods, ...Practical ApplicationsThe case-based reasoning (CBR) method has been shown to be an effective way to improve the accuracy of cost estimates. CBR is based on the idea of using the costs of previous, similar projects to estimate the cost of a future ...
publisherAmerican Society of Civil Engineers
titleAssessment of Pay Item Specific Case–Based Reasoning Approach for Bridge Unit Cost Estimation
typeJournal Article
journal volume151
journal issue12
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/JCEMD4.COENG-17052
journal fristpage04025188-1
journal lastpage04025188-12
page12
treeJournal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 012
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record