| description abstract | AbstractA pay item specific case–based reasoning (PCBR) approach was developed and assessed
for estimation of bridge repair and replacement unit costs. Rather than predict overall
project or unit cost as with typical case-based reasoning (CBR) methods, ...Practical ApplicationsThe case-based reasoning (CBR) method has been shown to be an effective way to improve
the accuracy of cost estimates. CBR is based on the idea of using the costs of previous,
similar projects to estimate the cost of a future ... | |
| publisher | American Society of Civil Engineers | |
| title | Assessment of Pay Item Specific Case–Based Reasoning Approach for Bridge Unit Cost Estimation | |
| type | Journal Article | |
| journal volume | 151 | |
| journal issue | 12 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/JCEMD4.COENG-17052 | |
| journal fristpage | 04025188-1 | |
| journal lastpage | 04025188-12 | |
| page | 12 | |
| tree | Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 012 | |
| contenttype | Fulltext | |